Purpose of project:

Provide a new pedestrian crossing that meets standards for a multi-use facility that is safe, ADA compliant and is aesthetically pleasing.

Schedule for project/construction:

  • Currently in Preliminary Design Phase
  • Public Meeting (includes online public information) – Summer 2018
  • Preliminary Design Memorandum – June 2018
  • Final Design – tentatively complete in 2019

Benefits of project:

Provide a new and improved  University Drive pedestrian bridge connection over I-44 for students that provides adequate width.

Project Fact Sheet:

To review the latest information on the University Drive Pedestrian bridge, click here.